Clearance to proceed with waterline and sewer lines – The Northeast Water and Sewer Line Projects will provide more reliable water pressure on the east end of Copperas Cove and greater sewer capacity in anticipation of commercial development. The City negotiated with the US Army Corps of Engineers to obtain the necessary easements to install the wa-terline and sewer line, and received clearance in July 2013 to proceed with the projects. Stormwater flows freely – The 2012 Drainage Projects were fully completed in 2013. These projects improved the flow of storm-water and helped alleviate the potential for localized flooding. These projects included: Curry Street -Construction of inlet box-es to decrease stormwater levels by piping the water to existing creeks. Rolling Heights -More than 1,100 linear feet of concrete lining and installation of concrete box culverts to provide greater flow. Texas and Golf Course Road -Replaced concrete lining and installation of con-crete box culverts to provide greater flow. Colorado Drive -Construction of a 24” high concrete stem wall 800 linear feet to properly divert stormwater. Page 28 City of Copperas Cove 2013 Annual Report

Previous Page  Next Page


Publication List
Using a screen reader? Click Here